| Interest | 100% |
| Location | Witbank |
| Production | 600ktpa |
| Resource | 1.2Mt within two seams |
Open cast mining commenced in December 2009 and has a steady state of production with a maximum capacity of 60,000 ROM tonnes per month.
Hartogshoop is a 24-month contractor operation with the mining method being essentially Opencast Truck and Shovel Roll Over. The mining layout is a single boxcut of 600 metres in length.